Construction period | 2023.12.22 ~ 2028.11.24 |
---|---|
Construction location | Seocheon-dong, Giheung-gu, Yongin-si, Gyeonggi-do ~ Banwol-dong, Hwaseong-si, Gyeonggi-do |
Orderer | Korea National Railway |
Construction outline | Tunnel : L=2.326km, Station : 2EA, 0.223km, Main Line Ventilation Shaft : 1EA |