Construction period | 2019.09.23 ~ 2021.12.31 (Completed) |
---|---|
Construction location | 158-26 Hakikdong Michuhol-gu Incheon |
Orderer | Incheon Water Supply Division |
Construction outline | Water Distribution System : V=20,000㎥ (Expansion 20,000㎥ → 40,000㎥) Structure : W43.5m × L54.9m × H4.5m × 2EA |