Construction period | 1994.12.31 ~ 2001.09.30 (Completed) |
---|---|
Construction location | Godeok-myeon, Pyeongtaek-si, Gyeonggi-do ~ Ssangam-ri, Mbong-myeon, Asan-si, Chungcheongnam-do |
Orderer | Korea High Speed Rail Construction Authority |
Construction outline | L = 18.809KM Earthwork 6.186KM Bridge 12.363KM(6EA) Tunnel 260(Open-cut Method) |