Gyeongbu High Speed Railway Lot 3
Construction period 1994.12.31 ~ 2001.09.30 (Completed)
Construction location Godeok-myeon, Pyeongtaek-si, Gyeonggi-do ~ Ssangam-ri, Mbong-myeon, Asan-si, Chungcheongnam-do
Orderer Korea High Speed Rail Construction Authority
Construction outline L = 18.809KM Earthwork 6.186KM
Bridge 12.363KM(6EA)
Tunnel 260(Open-cut Method)