Construction period | 1993.05.13 ~ 2000.03.10(Completed) |
---|---|
Construction location | Ssangam-ri, Eumbong-myeon ~ Jangjae-ri, Baebang-myeon, Asan-si, Chungcheongnam-do |
Orderer | Korea High Speed Rail Construction Authority |
Construction outline | L = 10.36KM Earthwork 4.359KM Bridge 4.241KM(6EA) Tunnel 1.760(NATM, Open-cut Method) Over-bridge 4EA |