Roadbed Construction of Gyeongbu High Speed Railway Lot 4-1
Construction period 1993.05.13 ~ 2000.03.10(Completed)
Construction location Ssangam-ri, Eumbong-myeon ~ Jangjae-ri, Baebang-myeon, Asan-si, Chungcheongnam-do
Orderer Korea High Speed Rail Construction Authority
Construction outline L = 10.36KM Earthwork 4.359KM
Bridge 4.241KM(6EA)
Tunnel 1.760(NATM, Open-cut Method)
Over-bridge 4EA