Construction of Expressway No. 700 Daegu Outer Circulation Package No.2
Construction period 2015.03.09 ~ 2022.05.27(Completed)
Construction location Maegok-ri Dasa-eup Dalseong-gun Daegu-si ~ Osan-ri Jicheon-myeon Chilgok-gun Gyeongsangbukdo
Orderer Korea Expressway Corporation
Construction outline Round Trip 4 Lanes New Construction(L=5.65km, B=20.0m)  
Bridge : 2,430m/19EA (Small Bridge 275m/8EA, Large Bridge 2,155m/11EA)  
Tunnel : 705m/1EA (Parallel Tunnel)