Package 3, under Central Luzon Link Expressway (CLLEX) Project, Phase 1
Construction period 2016.12.07 ~ 2023.01.26(Completed)
Construction location Central area of Luzon island
Orderer Department of Public Works and Highways (DPWH), Philippines
Construction outline Total L:= 9.7km, B= 24.5m (4 lanes)
Interchange 1 Site
Bridge 1 Site (L=42.5m, B=28.3m)
Asphalt Concrete Pavement