Construction period | 2016.12.07 ~ 2023.01.26(Completed) |
---|---|
Construction location | Central area of Luzon island |
Orderer | Department of Public Works and Highways (DPWH), Philippines |
Construction outline | Total L:= 9.7km, B= 24.5m (4 lanes) Interchange 1 Site Bridge 1 Site (L=42.5m, B=28.3m) Asphalt Concrete Pavement |