Views : 30
1. Name : Road Widening and Paving Construction from Sinpyeong to Simgok
2. Location : Sinpyeong-ri to Simgok-ri, Sinbuk-myeon, Pocheon-si
3. Overview : The road has a total length of 2.86 kilometers with a width ranging from 19.0 to 21.0 meters
4. Cost : KRW 24,251,565,455(Our share 49%: KRW 11,883,267,073), excluding VAT
5. Period : 2025.07.31 ~ 2029.07.29