Views : 13588
1. Project Name: Civil Engineering Works for Hamchang (Guhoeung) Natural Disaster Risk Improvement District Maintenance Project
2. Construction Location: Areas around Taebong-ri, Odong-ri, and Guhoeung-ri in Hamchang-eup, Sangju-si, Gyeongsangbuk-do
3. Construction Overview
-Drainage Pump Station (Q=812㎥/min, D1, 350mm x 4 units),
-Pipeline Improvement (L=970.3m, BOX B1.2×H1.0m to B3.0×H1.5m),
-Drainage Channel Maintenance (L=3,127.4m, concrete channel (U-shaped), earthwork channel),
-Auxiliary works, etc.
4. Construction Cost: 10,393,628,245 KRW (Our share: 5,092,877,840 KRW, 49%) / VAT excluded
5. Construction Period: From May 10, 2024, to May 9, 2027